For curing, rapid drying should be avoided in places with adequate ventilation, and the curing period is as shown in the table below.
Temperature |
Construction thickness(mm) |
20 |
30 |
40 |
50 |
60 |
70 |
80 |
Summer (40℃ or lower) |
6~7 days |
8~9 days |
11~12 days |
12~13 days |
14~16 days |
16~18 days |
18~20 days |
Spring, Fall (10~20℃) |
7~8 days |
9~10 days |
12~13 days |
14~16 days |
16~18 days |
18~20 days |
20~22 days |
Winter (4℃ or higher) |
9~10 days |
11~13 days |
14~16 days |
17~20 days |
21~24 days |
20~22 days |
22~24 days |
※ Curing period may vary depending on the environment of the work site, seasonal temperature and humidity, and construction thickness.